02 Phase D
Phase D – “Sim-Day Boot Loop” (Capstone Day)§
v 1.0 · 2025-05-16 – run after Phases A +B +C are 100 % green-ticked
1 Purpose & Success-Criteria (why this phase exists)§
| Goal | Measurable proof |
|---|---|
| Operator can execute the entire Solo-Team OS unassisted. | Manager receives a full evidence chain (Trello → Clockify → Insightful → Digest → WeekMetrics → Invoice) and needs zero back-channel nudges. |
| Artefacts match “What Great Looks Like”. | All green cells in the grading rubric (section 4). |
| Cycle time awareness. | Operator finishes Sim-Day in ≤ 3 real hours; no running timers afterwards. |
2 Prerequisites§
- Phase A +B +C ✓ (all Learning-Log files green, Oracle bot live).
-
Personal Trello board contains:
-
Sim-Day Sandbox list (copied from template).
- Templates list (Daily Hygiene, Weekly Metrics, Mini-Retro, Invoice).
SIM-DAYproject exists in Clockify (billable = ON).- Insightful folder
OP-<Name>/Insightful/SIM-DAY/selected. - “Boot-Camp Time-Ledger” Sheet has a fresh Sim-Day tab.
3 Step-by-Step Runbook (≈ 3 h real time)§
Clockify rule – every bold time-box below = a separate timer with description
SIM:<StepCode>:<Card-ID or Row>. Full tag list is printed on the Sim-Day Sandbox list cover card.
| Clock (real) | What you simulate | StepCode | Concrete actions & linked SOPs | Output / Evidence |
|---|---|---|---|---|
| 09 : 00 – 09 : 40 | Morning Work-Cycle | Q1 |
Daily Work-Cycle SOP • Copy 3 cards from Ready ⏳ → Q1 Doing (WIP ≤ 3). • One timer per card. • Complete & move to Q1 Done. |
3 Done cards + 3 Clockify entries + Insightful shots |
| 09 : 40 – 09 : 50 | Blocker escalation drill | BLOC |
Card SIM-BLK-01 spawns automatically. Label 🔴, run /alert, move to 🔴 Blocked. |
Alert message link + card comment timestamp |
| 09 : 50 – 10 : 20 | Ops-Sheet row work | OPS |
Work rows 12-14 in Sim-Sheet. Timer per row; description contains row link. |
3 Sheet rows updated + 3 timer links |
| 10 : 20 – 10 : 35 | Meeting Sync | MEET |
Open Meeting Outline PDF (board). Write 3 action items → Meeting Actions list. Stop timer "MEET – Daily Stand-up". |
3 action cards + TL;DR in card comment |
| 10 : 35 – 10 : 45 | Knowledge-Gap scenario | GAP |
Ask Coach a genuine question → follow Self-Help Checklist. If still stuck post 🔴Knowledge-Gap. |
Coach transcript + (maybe) gap post link |
| 10 : 45 – 11 : 05 | Inbox-Zero triage | TRIAGE |
Clear Inbox list; set Q1 To-Do ≤ 3 for next day. | Empty inbox + screenshot (optional) |
| 11 : 05 – 11 : 25 | Daily Hygiene & Digest | HYG |
TT-SOP-2 Evidence Export: • CSV • Insightful % PNG • Eisenhower PNG. DC-SOP-2 Digest W↑ C↓ T→ M → send & card → Waiting Approval. |
Hygiene card + Digest thread |
| 11 : 25 – 11 : 40 | Weekly Metrics + Invoice | MET INV |
RI-SOP-1 generate WeekMetrics.pdf. RI-SOP-3 draft Invoice.pdf (use today’s totals). Create Invoice card, attach PDF, ping manager. |
Weekly Packet card + Invoice card |
| 11 : 40 – 11 : 50 | Mini-Retro & Kaizen | RETRO |
RI-SOP-2 Mini-Retro: • Keep/Stop/Start in Miro mock frame. • Promote 1 Kaizen card to Q2 list. |
Retro Miro link + Kaizen card |
| 11 : 50 – 12 : 00 | Wrap & Proof-Check | WRAP |
• Verify no running timers. • Sheet “Sim-Day Ledger” matches Clockify total (±1 min). • Paste Digest thread link into Sheet Notes. |
Final Sheet totals + green Insightful status |
Real calendar date/time flexible—use local time; keep sequence intact.
4 Manager Grading Rubric§
| Area | Pass threshold |
|---|---|
| Work-Cycle | 3 cards done, Q1 Doing empty, WIP never > 3 |
| Timer evidence | 100 % entries linked; zero overlaps; SIM tag syntax used |
| Blocker drill | 🔴 card + /alert within 15 min (Slack timestamp) |
| Hygiene artefacts | CSV link opens; both PNGs legible; Eisenhower matches board |
| Daily Digest | Readable in ≤ 3 min; W↑ C↓ T→ M present; links valid |
| Weekly Packet | WeekMetrics.pdf + Invoice.pdf on correct cards |
| Retro + Kaizen | Miro link accessible; ≥ 1 blue-label Kaizen in Q2 |
| Ledger vs Clockify | Sheet total = Clockify total ± 1 min |
| Time discipline | No running timers after 12 : 00 local |
Pass = all green; any red = repeat Sim-Day next day (usually takes one attempt).
5 Clockify tag cheat-sheet§
SIM:Q1:<Card-ID>
SIM:BLOC:SIM-BLK-01
SIM:OPS:Row12
SIM:MEET:Stand-up
SIM:GAP:Coach
SIM:TRIAGE:InboxZero
SIM:HYG:Export
SIM:MET:WeekMetrics
SIM:INV:DraftInvoice
SIM:RETRO:MiniRetro
SIM:WRAP:Proof
(Printed on the Sim-Day list cover card for copy-paste ease.)
6 Hand-off email / Telegram snippet (send when finished)§
Subject: SIM-DAY package ready — <Your Name>
Sim-Day Boot Loop completed ✅
• Board https://trello.com/b/<id>
• Sheet Ledger https://docs.google.com/spreadsheets/d/<id> (Summary tab = <xx> min)
• Daily Digest https://t.me/c/<id>
• Invoice card https://trello.com/c/<id>
Please review—ready for live work!
7 Templates & Automation bits§
| Item | Where | Notes |
|---|---|---|
| Sim-Day Sandbox list | Trello template gallery | Contains cards SIM-01 … 06; top cover card lists tag syntax + schedule table. |
| Blocker spawn rule | Butler → every Sim-Day board at 09 : 40 | Create card "SIM-BLK-01 – simulated blocker" in list "📥 Inbox" |
| Evidence repeaters | Already in personal board Templates list | Daily Hygiene, Weekly Packet, Retro & Invoice are reused in live work. |
| Oracle bot | Live; no extra config | Operators can still use /find, /deepdive, /tip during Sim-Day, but rubric marks self-help not responsiveness. |
8 What to do after passing Sim-Day§
- Systems-Ops Lead moves operator’s personal board into the live Operators Hub workspace.
- Grant access to production Ops boards & Drive folders.
- Add operator to real Clockify Client Work projects.
- Archive the Sim-Day board for audit.
Phase D is now fully specified. Let me know if you want extra automation rules or a shorter compressed timetable; otherwise we can lock this in and proceed to Phase E (Boot-Retro + Graduation hand-off).